Profile image for King6024

Torbay Road Level Crossing

The current arrangement for the operation of this crossing is a track circuit just after Torquay Station. This results in the barriers coming down far to far in advance of an approaching train. This results in a huge traffic build up on Torbay Road and Hyde Road, especially in the summer.

I think network rail should move the crossing activation device nearer to Paignton, or even make it driver operated byt he gates. All trains have to stop at Paignton anyway, so it should not cause a problem, and would dramatically reduce congestion

  Report

By King6024 at 16:44 on 18/01/11

         Re-post           
 
      

Join the Discussion

       
max 4000 characters
        
      

Search for...

       
        
Min price is bigger than Max price
        
Min price is bigger than Max price
        
Min rent is bigger than Max rent